MY字典>英语词典>excavating翻译和用法

excavating

英 [ˈekskəveɪtɪŋ]

美 [ˈekskəveɪtɪŋ]

v.  发掘,挖出(古建筑或古物); 挖掘,开凿,挖空(洞、隧道等)
excavate的现在分词

现在分词:excavating 

柯林斯词典

  • VERB 发掘,挖掘(古物等)
    When archaeologists or other peopleexcavatea piece of land, they remove earth carefully from it and look for things such as pots, bones, or buildings which are buried there, in order to discover information about the past.
    1. A new Danish expedition is again excavating the site in annual summer digs.
      一支新的丹麦探险队又在那个遗址上进行一年一度的夏季挖掘。
  • VERB 挖;开凿
    Toexcavatemeans to dig a hole in the ground, for example in order to build there.
    1. A contractor was hired to drain the reservoir and to excavate soil from one area for replacement with clay.
      雇了一个承包商抽干水库的水,挖掉一个区域的泥土后再用黏土填上。

双语例句

  • Research on influence of excavating road trench slope on adjacent existing tunnel
    路堑边坡开挖对邻近既有隧道影响研究
  • Application of Smooth Blasting Technique in Engineering of Excavating Tunnel in Soft Rock Area
    光面爆破技术在软岩地区隧洞开挖工程中的应用
  • Surrounding rock mass is in a new humidity condition when underground cavern is excavating, which will change mechanical properties.
    地下洞室开挖过程中,围岩处于新的湿度环境中,力学性能会发生改变。
  • Treatment and intelligent recognition of photo of tunnel excavating face with new Austrian tunneling method;
    为此,本文提出将随机有限元法和神经网络相结合,进行传热参数的智能辨识。
  • Based on practice of excavating piles, the reasons conditions and preventive measures about damage by blasting on supporting rocky layer, pillar ground support and concrete in pile have been proposed.
    依据大量掘桩实践,论述了掘桩爆破对持力岩层、护壁、桩间岩柱、邻桩支护和新浇砼损伤的原因、条件和防范措施。
  • Theoretical and Application Study on the Dynamic Visual Mining and Excavating Management System of Coal Mine
    煤矿采掘工程动态可视化管理理论与应用研究
  • Numerical Simulation for Excavating Process and Stability Analysis of Bedding Rock Slope
    顺层岩质边坡开挖过程模拟及稳定性分析
  • Application of long-hole loose controlled blasting technique in excavating consequent bed cutting slope
    深孔松动控制爆破技术在顺层路堑边坡开挖中的应用
  • The accumulative damage range of surrounding rock is mainly determined by the blasting of excavating face of pilot tunnel I which is parallel to it.
    侧壁围岩的累计损伤范围主要由与其齐平的导洞I的开挖掌子面爆破决定;
  • Roads across the quake-hit area are clogged with cement mixers, dump trucks and excavating equipment.
    地震灾区各处道路都满是混凝土搅拌车、自动卸货卡车和挖掘设备。