MY字典>英语词典>impounding翻译和用法

impounding

英 [ɪmˈpaʊndɪŋ]

美 [ɪmˈpaʊndɪŋ]

v.  暂时没收; 扣押; 收留(待领的狗、猫等)
impound的现在分词

柯林斯词典

  • VERB 扣押;没收
    If somethingis impoundedby policemen, customs officers or other officials, they officially take possession of it because a law or rule has been broken.
    1. The ship was impounded under the terms of the UN trade embargo...
      该船因触犯联合国贸易禁运条款而被扣押。
    2. The police moved in, arrested him and impounded the cocaine.
      警察冲进去将他拘捕并没收了可卡因。

英英释义

noun

双语例句

  • So what Cai did to stop them from illegally impounding and taking away their properties wouldn't possibly commit a crime of disruption public order.
    那么蔡和他的父亲的阻止他们非法扣押搬走自己财物的行为不属于妨害公务行为。
  • Layout of Dongfeng Hydropower Station and Observation and Analysis of Arch Dam Character in the Early Impounding Stage
    东风水电站枢纽布置及初期蓄水拱坝性态观测分析
  • There are no key-ways made in the upper longitudinal joints in Fengman Dam and no grouting before impounding.
    丰满大坝纵缝上部未设键槽,蓄水前又未灌浆;
  • Tow guy: The government is impounding it.
    政府没收了,这是你的收据。
  • Therefore, it is considered that after reservoir impounding, the main bank-slope engineering geological problems of study area is the resurrection of the old landslide on the right bank and the occurrence of new landslide on the left bank.
    因此,认为水库蓄水后,研究区主要的岸坡工程地质问题是右岸老滑坡的复活和左岸新滑坡的发生。
  • Periodic impounding and draining of the water reservoir would be implemented after the projects were in service.
    在水库工程运营后,将按计划进行周期蓄、排水。
  • The main problem on simulation of tectonic stress field after reservoir impounding in the head area of the Three Gorges is the influence of "canyon effect" and "rock soften".
    迄今为止,长江三峡库首区蓄水对上地壳构造应力场影响的数值模拟研究中存在的最大问题是未考虑地形“峡谷效应”和库水下渗导致“岩石弱化”的影响。
  • On this basis, the start impounding time and water storage program can be study comprehensively in the future.
    今后可在此基础上继续深入全面研究,进一步提前蓄水开始时间和加快蓄水进度。
  • As of now I'm impounding all of this.
    现在我要将所有这些都扣留。
  • The result shows that this model can effectively coordinate the benefits of flood control, power generation and transportation of the Project in the process of impounding.
    结果表明,优化设计能权衡防洪与兴利之间的关系,充分挖掘汛初与汛末的潜力,提高三峡水库运行初期的综合效益。