MY字典>英语词典>sprints翻译和用法

sprints

英 [sprɪnts]

美 [sprɪnts]

v.  短距离快速奔跑(或游泳); 冲刺
n.  短跑比赛; 短距离速度竞赛; 短距离快速奔跑(或游泳等); 冲刺
sprint的第三人称单数和复数

柯林斯词典

  • N-SING 短跑
    The sprintis a short, fast running race.
    1. Rob Harmeling won the sprint in Bordeaux.
      罗布·哈梅林在波尔多获得短跑冠军。
    2. ...the women's 100-metres sprint.
      女子 100 米短跑
  • N-COUNT 短程竞速赛
    Asprintis a short race in which the competitors run, drive, ride, or swim very fast.
    1. Lewis will compete in both sprints in Stuttgart...
      刘易斯将参加在斯图加特举行的两个短跑项目的比赛。
    2. I knew there were other riders who could beat me in a sprint.
      我知道还有其他骑手可能在短程赛马中打败我。
  • N-SING 冲刺;快跑
    A sprintis a fast run that someone does, either at the end of a race or because they are in a hurry.
    1. Gilles Delion, of France, won the Tour of Lombardy in a sprint finish at Monza yesterday...
      法国选手吉勒斯·德利翁昨天在蒙扎凭借最后的冲刺获得伦巴第巡回赛冠军。
    2. The police retreated at a sprint...
      警方快速撤退。
    3. I broke into a sprint.
      我开始飞快地跑了起来。
  • VERB 全速奔跑;(短距离)冲刺
    If yousprint, you run or ride as fast as you can over a short distance.
    1. Sergeant Horne sprinted to the car.
      霍恩中士全力冲向那辆汽车。

双语例句

  • This way, you can practice the appropriate starts, turns and sprints in the warm-up.
    这样,你可以练习一下正确的出发和转身并作一下热身的短冲。
  • Lewis will compete in both sprints in Stuttgart
    刘易斯将参加在斯图加特举行的两个短跑项目的比赛。
  • I want to be the king of sprints because I think I am.
    我想成为短跑之王,因为我认为我本来就是。
  • If I didn't play like him I had to do extra sprints. I would get in trouble.
    如果我没有像他一样的打球,那么我就还要做其他的努力,我会陷入困境。
  • There are multiple, iterative development sprints, or cycles, that are used to evolve the system.
    为了提升系统性能,会有多次的、迭代的开发冲刺或循环。
  • In this example, the planned work remained constant over the first three sprints.
    在本例中,规划的工作在前三个Sprint阶段中一直是个常量。
  • Development and integration of test cases in the component Sprints during the particular Iteration.
    在特定迭代过程中的组件Sprint中开发和整合测试案例。
  • Perform usability tests every two-three sprints to make sure new design implementations are well received.
    每两到三次Sprint做一次可用性测试,确保新的设计实现没有问题。
  • Synchronization does not mean that all the sprints should finish on the same day.
    同步不是说所有的sprint都要在同一天完成。
  • The next step is to plan the timelines for the project, which means that you specify the start and end dates for the release and the sprints.
    接下来的一步,是为项目规划时间限制,这意味着您要为发布和冲刺指定起始和截止日期。